Part Number: 80GY0102©2008 Pella Corporation Always read the Pella® Limited Warranty before purchasing or installing Pella products. By installing thi
INSTALLING ROTO COVER AND CRANKLOCK LEVER REMOVAL AND INSERTIONNote: Finish the interior of the window and allow the window to dry before proceeding w
A. Verify the opening is plumb and level. Note: It is critical that the bottom is level.1ROUGH OPENING PREPARATIONREMEMBER TO USE APPROPRIATE PERSON
D. Fold the water resistive barrier (1D). Fold side and bottom flaps into the opening and staple to inside wall. Fold top flap up and temporarily fasten
B. Windows using Frame Screws: On the roomside of vent windows, drill 13/64" diameter clearance holes through the head, jambs and sill of the
3SETTING AND FASTENING THE WINDOWTWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS."*OUFSJPS##&A. Insert the window from the e
A. Apply side flashing tape. Cut two pieces of flashing tape 5" longer than the frame height of the window. Apply the tape 1/2" onto the fram
B. Drill 1/8" x 1" deep pilot holes into the rough framing through the clearance holes in the unit frame.C. Fasten the window to the openi
8SEALING THE WINDOW TO THE EXTERIOR WALL CLADDINGWhen applying siding, brick veneer or other exterior finish material, leave adequate space between the
INTERIOR FINISHINGIf products cannot be finished immediately, cover with clear plastic to protect from dirt, damage and moisture. Remove any constructi
Comments to this Manuals